Electrical-supply preparation for EV charging — EV charging-point installer
Describe the proposed EV charger and provide information about the existing customer-side electrical installation. Ask the installer to identify the distribution, meter and network boundaries and any separate approvals or specialist visits. A cabinet photograph alone does not establish available capacity.
Service scope
Assessment and coordination of customer-side electrical preparation needed for an identified EV charger, including the relevant distribution equipment and interfaces with metering or the network supply. Meter, main-fuse and distribution-board responsibilities are identified separately for the market and property.
What is normally included
- Assess customer-side electrical preparation for the charger
- Define distribution and connection interface responsibilities
- Complete the agreed preparation and handover to the charger installer
What is not included
- No unauthorised work on metering/network equipment
- No universal assumption that meter cabinet means consumer unit
- Unauthorised alteration of utility-owned equipment
- Assumption that a cabinet photograph proves spare capacity
Typical tasks
- Assess customer-side electrical preparation for the charger
- Define distribution and connection interface responsibilities
- Complete the agreed preparation and handover to the charger installer
- Record the agreed preparation specification and any dependencies on network-side action
- Arrange the documented handover of completed customer-side work to the charger installer
What to include in your brief
- Charger demand and customer installation
- Meter/network/customer-side equipment boundary
- Tasks assigned to electrician, supplier or network operator
- Available installation records and the proposed charger location or cable route
- Existing major electrical loads and the planned installation date
Choosing the right professional
Choose a provider who clearly separates customer equipment from metering and network equipment. Establish who designs, approves and carries out each part of the preparation.
Important considerations
- Supply capacity or equipment ownership can require another party to act
- Unidentified interface work can affect installation cost and scheduling