FixThatNow

Insulation for new builds — Insulation company

Provide the current drawings, insulation schedule and construction programme. Identify which elements are ready and who approves substitutions so the installer can plan work before the assemblies are closed or covered by following trades.

Service scope

Installation and coordination of insulation within a new-building design, following specified assemblies and construction stages. The service focuses on translating the design into installed work and evidence rather than independently setting every thermal or fire requirement.

What is normally included

  • Insulation installation to the project design
  • Coordination of construction junctions
  • Recording materials and concealed-work stages

What is not included

  • Unauthorised substitution of specified systems
  • Automatic responsibility for whole-building compliance design

Typical tasks

  • Review the current specification
  • Coordinate installation stages
  • Check delivered materials against the schedule
  • Install the agreed systems and junctions
  • Record concealed-work evidence for handover

What to include in your brief

  • Drawing revision
  • Material and performance schedule
  • Construction-stage programme
  • Designer and approval contacts
  • Inspection and evidence requirements

Choosing the right professional

Compare installers on coordination and evidence as well as area rates. Ask how specification changes, junction details and inspection stages are controlled so the installed system remains traceable to the approved design.

Important considerations

  • Outdated drawings can cause conflicting installations
  • Later trades can disturb concealed insulation

Explore FixThatNow

Describe the work, choose the service and location, and receive relevant responses.