FixThatNow

Ground preparation for paving — Paving contractor

Provide the intended surface, use and dimensions, along with any existing construction or drainage information. Clarify whether you want preparation only or a complete pavement so responsibilities for levels, materials and acceptance by the laying contractor are explicit.

Service scope

Assessment and preparation of a site to receive a specified paved surface, including agreed excavation, formation and supporting-layer work. The finished pavement, expected loading and drainage design determine the brief; ground preparation is not a universal depth of excavation or a substitute for structural ground advice.

What is normally included

  • Preparation against an agreed pavement design
  • Defined excavation and material handling
  • Handover of the prepared area to the next trade

What is not included

  • Unspecified excavation around unknown services
  • A guaranteed foundation without ground assessment

Typical tasks

  • Review the intended pavement specification
  • Assess access and known services
  • Define excavation and disposal
  • Prepare agreed supporting layers
  • Record the handover condition and exclusions

What to include in your brief

  • Intended paving system
  • Area and loading
  • Site-level information
  • Known utilities and ground history
  • Scope split with the laying contractor

Choosing the right professional

Ask what specification the contractor is working to and how the prepared area will be accepted. Compare disposal, unsuitable-ground assumptions and handover responsibilities rather than an unexplained dig-and-fill allowance.

Important considerations

  • Unidentified services can make excavation hazardous
  • Unsuitable ground can require a revised design

Explore FixThatNow

Describe the work, choose the service and location, and receive relevant responses.