New-build enquiries need design maturity and procurement clarity. Contractors should establish the package boundaries, site information and intended completion standard before pricing the project as a complete building.

Service scope

Construction of a new building from a defined design and specification, including the agreed structure, envelope and completion packages. Site investigation, utility connections, professional design and statutory approvals are explicit interfaces rather than assumed inclusions.

What is normally included

  • Construction against issued project information
  • Coordination of the agreed building packages
  • Inspection and handover records within scope

What is not included

  • Unverified site suitability
  • Design, land purchase or utility charges assumed in a construction-only offer

Qualification checks

  • Confirm drawing revisions
  • Review ground and access evidence
  • Identify utility-interface responsibility
  • Check specification completeness
  • Define inspection and handover obligations

Quote guidance

Provide a structured tender by package with clearly named exclusions. Separate unresolved site or design allowances and identify what is needed before those allowances can become firm prices.

Lead risks

  • Early drawings may omit essential technical details
  • Delayed utilities or design information can affect the programme